More news on this day
Rail access to Poland’s remote Bieszczady Mountains is set to improve significantly as infrastructure projects advance on a new Jedlicze–Szebnie connector and the revitalisation of the Jasło–Nowy Zagórz railway, creating a more direct link from Rzeszów through Krosno and Sanok toward the southeastern borderlands.
Get the latest news straight to your inbox!

New Jedlicze–Szebnie Connector Reshapes Regional Rail Geometry
Publicly available project information shows that the planned Jedlicze–Szebnie rail connector will physically join railway lines 106 and 108 east of Jasło, removing today’s need for trains from Rzeszów to reverse direction at Jasło before continuing toward Krosno and Sanok. Reports indicate the new link will run for about 3.4 kilometers between the existing Szebnie and Wojaszówka stops, allowing through services to operate on a more direct north–south axis toward the Bieszczady foothills.
According to information published by infrastructure manager PKP Polskie Linie Kolejowe, the connector forms part of a broader program to improve rail access in southeastern Poland, where mountainous terrain and historic route layouts have long constrained journey times. The new alignment is designed to simplify operations for regional carriers and reduce bottlenecks on a corridor that has become increasingly important for both domestic tourism and freight moving toward the country’s eastern frontier.
Government transport documentation notes that eliminating the reversal at Jasło is expected to shorten journeys from Rzeszów toward Krosno, Sanok and Nowy Zagórz, and to make it easier to schedule clockface services that can connect with long distance trains in the Subcarpathian capital. The connector is therefore presented as a structural change in how trains can be routed across the region, rather than a minor local bypass.
Project materials place completion of the connector works in the second half of this decade, with published timelines currently pointing to the late 2020s for the end of construction. That timeframe aligns with the wider modernization program on line 108, so that new track geometry and upgraded infrastructure can come into use in a coordinated way.
Revitalisation of Line 108 Targets Faster Trips to Krosno and Sanok
Alongside the connector, a major revitalisation of railway line 108 between Jasło and Nowy Zagórz is under way, co financed from European funds for eastern Poland. Official investment overviews describe the project as covering around 66 kilometers of track, including modernization of track, engineering structures and signaling, as well as improvements to stations and stops serving communities along the corridor such as Krosno, Zarszyn, Sanok and Nowy Zagórz.
According to project data made available by national ministries and the EU’s transport programs, the upgrade is expected to raise permissible line speeds and allow heavier trains to operate. Published estimates indicate that travel times between Rzeszów and key intermediate cities like Krosno and Sanok should fall by roughly 20 to 25 minutes once the works and connector are fully in place, a significant saving on journeys that today can feel lengthy compared with road alternatives.
Investment summaries list ten stations on line 108 earmarked for substantial rebuilding, including Jasło, Tarnowiec, Jedlicze, Krosno, Targowiska, Wróblik Szlachecki, Zarszyn, Nowosielce, Sanok and Nowy Zagórz. These upgrades are intended to deliver higher platforms, better accessibility and improved passenger facilities, in line with modern standards being rolled out on many Polish regional routes.
Current schedules for the revitalisation work suggest that construction on the line 108 section is planned to be completed around the middle of 2028, while the Jedlicze–Szebnie connector is due to follow roughly a year later. Once both elements are finished, infrastructure managers project that the Rzeszów–Krosno–Sanok axis will offer faster and more reliable journey options, with scope for additional passenger and freight services.
Existing Services Point to Growing Demand for Bieszczady Rail Travel
While the new connector is still in the delivery phase, recent timetable changes already highlight growing interest in rail access to the Bieszczady area. Regional operator Polregio has progressively developed seasonal and weekend services branded around the Bieszczady identity, including trains running from Rzeszów through Jasło, Jedlicze, Krosno and Sanok to Zagórz, Uherce and Ustrzyki Dolne at the gateway to the mountains.
Information released by the Podkarpackie regional authorities describes how a weekend service from the regional capital toward Ustrzyki Dolne has been scheduled to stop only at selected stations, providing a faster option for leisure travelers. The stopping pattern typically includes key communities along the corridor such as Boguchwała, Czudec, Strzyżów nad Wisłokiem, Jasło, Jedlicze, Krosno, Sanok, Zagórz and Uherce, underlining the role of the line in serving both local mobility and long distance tourism.
Timetables published for the 2024 and 2024 to 2025 timetable periods show additional regional connections that strengthen links between Jasło, Krosno and Sanok, with named trains operating across the San valley and connecting with services from Rzeszów. These patterns suggest that operators and regional authorities are already testing demand and refining stopping schemes ahead of the longer term infrastructure improvements now moving forward.
Reports in specialist regional media describe the Bieszczady services as a milestone for rail based tourism in Podkarpackie, offering an alternative to often busy regional roads and providing a more sustainable way to reach trailheads, lakes and heritage towns. The planned infrastructure upgrades are expected to support further timetable development, including the possibility of more frequent off season trains as line capacity and operating conditions improve.
Strategic Role for Tourism, Border Access and Freight
Policy documents connected with the revitalisation of line 108 and the Jedlicze–Szebnie connector frame the investment as part of a broader strategy to strengthen Poland’s southeastern transport network. The line runs toward the vicinity of the Polish Ukrainian border, where existing routes connect through Krościenko to Ukrainian rail infrastructure, making the corridor relevant not only for tourism but also for cross border freight and potential humanitarian logistics.
European funding materials emphasize that improving rail access to the Bieszczady region should enhance the economic prospects of smaller towns such as Krosno and Sanok, which act as gateways to the mountains and host growing numbers of visitors each year. Faster and more reliable rail journeys from Rzeszów could encourage more tourists to choose public transport over private cars, particularly during the peak hiking and skiing seasons when local roads face congestion.
At the same time, raising line speeds and axle load limits on line 108 is expected to facilitate more efficient freight operations toward the southeastern borderlands. Publicly accessible analyses highlight the potential for heavier trains to move timber, construction materials and other bulk commodities along a route that presently has capacity and speed constraints, thereby supporting regional industries and border trade.
In combination, the connector and the line upgrade are presented in official and EU level documents as a package that increases resilience and flexibility across the Podkarpackie rail network. The ability to route trains directly from Rzeszów to Sanok and Nowy Zagórz without operational reversals should give planners more options when arranging both passenger and freight paths, especially during disruptions or seasonal peaks.
Timelines and What Travelers Can Expect in the Coming Years
For travelers, the most visible effects of the current works will materialize gradually over the next few timetable periods. Construction schedules published by the infrastructure manager indicate that modernization activity on line 108 is ongoing, with periodic timetable adjustments and replacement bus services possible on some sections while track and station works proceed.
Once the Jasło–Nowy Zagórz route has been fully renewed, passengers can expect smoother rides, upgraded platforms and more accessible station layouts at key stops between Jasło and Nowy Zagórz, including improved interchange conditions in towns such as Krosno and Sanok. With the subsequent opening of the Jedlicze–Szebnie connector, through trains from Rzeszów should be able to cover the distance to the Bieszczady gateway faster and without the current operational complexities at Jasło.
Detailed future timetables have not yet been released, but official investment summaries consistently mention journey time reductions in the range of several tens of minutes on the Rzeszów–Krosno–Sanok axis once the projects enter service. Combined with the pattern of recent seasonal services, this points toward a long term trend in which rail becomes a more attractive option for accessing Poland’s southeastern highlands.
Travelers planning trips in the interim are advised to consult current timetables from operators such as Polregio, as service patterns can change during construction phases. However, the direction of investment and the scope of the works indicate that by the end of the decade, the Bieszczady region is likely to be significantly better connected to Rzeszów and the wider national rail network than it is today.
PKP Polskie Linie Kolejowe: Torujemy kolej w Bieszczady – jest umowa na łącznicę
Gov.pl: Wygodniej, bezpieczniej i szybciej koleją w Bieszczady
PKP PLK: Rewitalizacja linii kolejowej nr 108 i budowa łącznicy Jedlicze–Szebnie
Urząd Marszałkowski Województwa Podkarpackiego: Nowe połączenie kolejowe w Bieszczady