More news on this day
The long‑anticipated Adapazarı–Serdivan tramway in Turkey’s northwestern Sakarya province has cleared a major milestone, with reports indicating that the construction contract for the line has now been signed following the conclusion of the procurement process.
Get the latest news straight to your inbox!

Key details of the Adapazarı–Serdivan tramway project
Publicly available tender information shows that the Adapazarı–Serdivan tramway will extend for about 18.5 kilometers, linking the Adapazarı city center with the rapidly growing Serdivan district and the university area on a single continuous corridor. The scheme has been developed under the authority of Turkey’s General Directorate of Infrastructure Investments, which has overseen design, engineering and now the build-and-install stages for the project.
According to published coverage in Turkish transport and local news outlets, the line is planned with around 15 stations along its length, serving key residential neighborhoods, commercial hubs and education zones. The alignment is expected to run broadly along the Adapazarı–Serdivan–campus axis, mirroring existing bus demand but shifting a large share of this traffic to fixed rail.
Reports on earlier planning documents indicate that the tramway will be equipped with modern low-floor vehicles, platform-level boarding and an integrated ticketing structure compatible with Sakarya’s wider public transport system. The infrastructure package covered by the construction contract also includes civil works for the track platform, power supply and catenary systems, signaling and telecommunication equipment, as well as associated depot and maintenance facilities.
The tramway has been described in local media as one of Sakarya’s largest recent transport investments, framed as a flagship project to reshape how residents move between the metropolitan core and the expanding suburbs. With the contract now signed, attention is turning to how rapidly construction can begin along the first segments of the route.
From tendering to contract signing
The path to contract signing has involved a series of formal steps over the past year. Notices published through Turkey’s public procurement channels show that the Ministry of Transport and Infrastructure initiated the main construction and electromechanical works tender for the Adapazarı–Serdivan tramway in the first half of 2026, after earlier completing separate consultancy and control-service tenders for design and supervision.
Industry-focused reporting explains that offers for the construction and systems package were collected during the spring, following which evaluation and clarifications were carried out in line with Turkey’s public procurement regulations. Once the preferred bidder emerged, the contracting authority issued a formal invitation to sign, leading to the agreement that has now reportedly been concluded.
Local coverage in Sakarya notes that the tender encompasses not only civil construction but also the procurement, installation and commissioning of electromecanical systems required to bring the line into service. This integrated approach is expected to streamline the handover from build to operations by placing responsibility for both infrastructure and core systems within a single contract framework.
With the signing phase completed, the project moves from a planning and procurement focus into what officials have previously described in public statements as the implementation stage. The coming months are expected to see preparatory activities such as detailed construction programming, site setup and early utility relocation along parts of the future alignment.
Urban mobility impact for Sakarya and its districts
Transport observers in Turkey have long highlighted the Adapazarı–Serdivan corridor as one of Sakarya’s busiest urban axes, linking the historic center with shopping areas, new housing developments and university facilities. Existing bus and minibus services on this corridor often experience congestion and variable journey times, particularly at peak hours when car traffic on arterial roads intensifies.
By introducing a dedicated tramway on a fixed alignment, planners aim to provide more reliable travel times and a higher-capacity alternative to road-based services. The 18.5-kilometer length and 15 planned stops are designed to balance coverage with speed, creating a line that can function as a backbone for urban mobility across multiple districts while allowing for feeder bus connections at key nodes.
Published commentary in local and national outlets frames the project as a step toward modernizing Sakarya’s public transport, in line with similar rail-based investments in other Turkish cities. Travel-news and infrastructure analysts point out that such tram systems can also generate secondary benefits, including improved pedestrian environments around stations and the potential for more transit-oriented development along the main route.
For visitors and business travelers, the tramway is expected to offer a straightforward way to move between Adapazarı’s core, emerging commercial zones in Serdivan and the university area without relying on taxis or private vehicles. Once operational, the line could also make it easier to connect with regional rail services, enhancing Sakarya’s position as a gateway along key road and rail corridors in northwestern Turkey.
Timeline, construction phases and next steps
While a precise opening date has not yet been widely reported, comparable urban tramway projects in Turkey suggest a multi-year construction timeline from contract signing to the start of passenger services. Industry examples indicate that complex rail infrastructure schemes, including track, stations and electromechanical systems, commonly require phased works and testing periods before entering full operation.
According to project-related reporting, the Adapazarı–Serdivan tramway is likely to be built in stages, allowing contractors to focus initially on sections where land and utility constraints are easier to manage. Subsequent phases would advance through more complex urban segments, with traffic management measures introduced to maintain access for residents and businesses during construction.
Supervision and control roles are being established through dedicated consultancy tenders, which will oversee quality, safety and environmental compliance as work proceeds. Public information suggests that coordination with municipal authorities and existing road projects will be essential, particularly at major intersections and around future station areas.
As the implementation phase gets underway, attention from local media and residents is expected to shift from contract and tender milestones to visible progress on the ground, including early works, track laying and the emergence of new tram stops along the corridor. For the wider travel community, the project will be closely watched as another indicator of Turkey’s continued emphasis on rail-based urban transport solutions.
Positioning within Turkey’s wider rail and tram expansion
The Adapazarı–Serdivan tramway joins a growing portfolio of rail and tram investments across Turkey, where national and local authorities have pursued light rail, metro and commuter-rail expansions over the past decade to respond to rapid urbanization. Cities such as Konya, Kayseri, Eskişehir and Kocaeli have all introduced or extended tram systems, with reported gains in public transport share on key corridors.
Transport analysts note that Turkey’s approach often combines central-government funding and technical oversight with local planning priorities, a structure that appears to be mirrored in the Sakarya project. The involvement of the General Directorate of Infrastructure Investments in Adapazarı–Serdivan reflects the corridor’s perceived strategic significance, linking a provincial capital with its major suburban and educational districts.
For domestic travelers and international visitors familiar with other Turkish cities, the planned tramway may offer a level of service and user experience comparable to established systems elsewhere in the country. Features typically associated with recent Turkish tram projects, such as accessible platforms, electronic passenger information and integrated ticketing, are expected to form part of the Adapazarı–Serdivan line as well.
As contract signing marks the transition from plans to construction, the project’s progress will provide further insight into how mid-sized Turkish cities are adopting rail-based solutions to manage growth, reduce congestion and improve the overall appeal of urban travel. Observers will be watching how effectively the Sakarya scheme delivers on these goals once the first trams begin running along the Adapazarı–Serdivan corridor.