More news on this day
Passengers heading to and from London Stansted Airport are being urged not to travel by rail after a major incident triggered severe disruption on lines linking the airport with London Liverpool Street, Hertford East and Cambridge.
Get the latest news straight to your inbox!

Major incident severs key rail corridor to Stansted
National Rail’s live disruption pages on Wednesday 26 August indicate a major incident causing what is described as “do not travel” conditions between London Liverpool Street and Hertford East, Stansted Airport and Cambridge, with disruption expected until the end of the day.
The warning covers the Stansted Express and other Greater Anglia routes that form the principal rail link between central London and the airport, as well as commuter and intercity services through the Lea Valley corridor. Journey planners are currently showing widespread cancellations, heavily revised timetables and extended journey times across the affected stretch of line.
Greater Anglia’s real time service updates echo the National Rail message, advising customers not to travel on the route between London Liverpool Street and Hertford East, Cambridge and Stansted Airport until further notice, and noting that services are cancelled, delayed or revised while the operator attempts to recover its timetable.
The disruption follows reports of an earlier incident between Cheshunt and Broxbourne on Tuesday 25 August, which halted services in the area and left knock on delays across the Greater Anglia network into Wednesday.
Impact on Stansted Airport passengers
The rail shutdown is particularly significant for London Stansted, where the dedicated Stansted Express and related Greater Anglia services normally carry large volumes of passengers and staff to and from the airport each day. With the main rail artery from London severely disrupted, travellers are being forced to turn to road based alternatives at short notice.
JourneyCheck information for Greater Anglia services to and from Stansted Airport shows multiple cancelled departures and arrivals, along with advice that ticket restrictions have been lifted for affected dates to give customers more flexibility when rebooking. The operator notes that services remain subject to disruption even where trains are shown as running, as the network works back towards its normal timetable.
Passengers with flights on Wednesday and into Thursday are being advised via online journey planners and operator updates to leave significantly more time for their journeys, to check live information before departing for the airport and to consider non rail options if possible. Travellers who cannot postpone their journeys are being directed towards a patchwork of alternative routes using other train operators and local transport where available.
The disruption adds to a period of intermittent rail reliability for the airport. National Rail’s engineering works programme already includes a reduced service between London Liverpool Street and Stansted Airport on Sunday 16 August for pre planned works, further tightening rail access on key summer travel dates.
Alternative routes and ticket acceptance
According to live updates published by Greater Anglia, customers holding Greater Anglia or Stansted Express tickets are being offered ticket acceptance on a range of other services so that essential journeys can still be completed. Advisories indicate that tickets can be used on specified alternative rail routes and, in some cases, other operators’ services at no extra cost.
From Stansted Airport itself, one suggested route for some passengers is to travel on the first available train towards Cambridge and then connect onto other services where capacity permits. However, National Rail journey planners currently warn that onward connections are also at risk of delay or cancellation because of the scale of the disruption radiating from the affected corridor.
For journeys entirely within London, travellers may find that Transport for London’s services, including the Underground and Elizabeth line, can provide partial alternatives once away from the core affected section of the National Rail network. However, there is no direct replacement for the dedicated Stansted Express link between Liverpool Street and the airport, meaning that many passengers will have to switch to coach or private road transport.
National Rail and Greater Anglia channels both stress the importance of checking live information immediately before setting out, as timetables and ticket acceptance arrangements may be adjusted through the day in response to conditions on the ground.
Road and coach options under pressure
With the primary rail route disrupted, demand is expected to rise sharply for road and coach services serving Stansted Airport and the wider region. Previous reports from local airport stakeholder groups indicate that operators such as National Express and other coach companies have, in recent years, expanded services to and from Stansted to help manage periods of rail disruption, including during industrial action and engineering works.
On days of significant rail problems, the airport has in the past worked with coach providers and local transport forums to ensure additional capacity into London and key regional hubs. Publicly available meeting notes from Stansted’s consultative committees refer to shuttle buses and enhanced coach frequencies used to support both staff and passengers when rail access has been reduced.
Motorway and trunk road corridors around the airport, including the M11 and A120, are likely to face heavier traffic as more travellers turn to cars, ride hailing and taxis. Drivers are being encouraged via online travel advisories to allow extra time for congestion and to check for any separate incidents on the road network that could add to delays.
For some passengers, especially those with early morning or late night flights, overnight stays at airport hotels or park and ride facilities may be a practical way to mitigate the risk of missing departures while the rail network recovers.
What passengers should do now
Current National Rail updates recommend that anyone planning to use services between London Liverpool Street, Hertford East, Cambridge and Stansted Airport on Wednesday 26 August and into the early hours of Thursday should assume that disruption will continue until the end of service. Journey planners list the incident as a major disruption and maintain the “do not travel” message for the affected routes.
Passengers who decide not to travel are being directed towards refund or change of journey options via their original retailer or train operator, in line with standard National Rail Conditions of Travel. Combined with the temporary lifting of ticket restrictions, this gives affected customers more scope to rebook for later dates once services have stabilised.
Those who must travel are advised to confirm the status of their specific train shortly before departure, to check whether ticket acceptance is in place on alternative rail routes and to consider coach, taxi or private car options where appropriate. Airport bound passengers in particular are urged to build in substantial contingency time given the risk of missed check in or boarding deadlines.
As the situation evolves, National Rail’s status pages, Greater Anglia’s JourneyCheck service and airport travel advice channels are expected to provide the most up to date information on train running, replacement options and any change to the “do not travel” guidance.
National Rail live disruption information
Greater Anglia JourneyCheck live updates
Planned engineering works affecting Stansted Airport services